general

GPHA Board inspects Tema Port dredging, breakwater rehabilitation works

GPHA Board inspects Tema Port dredging, breakwater rehabilitation works

The Board of Directors of the Ghana Ports and Harbours Authority (GPHA), led by its Chairman, John Asiedu Nketiah, has inspected ongoing infrastructure works at the Port of Tema to assess their progress and impact on port operations. The Director-General of GPHA, Major General Paul Seidu Tanye-Kulono, said he was optimistic that completing the projects would boost the Authority’s operational and commercial prospects by enabling larger vessels to berth safely at the Port of Tema.

The Board of Directors of the Ghana Ports and Harbours Authority (GPHA), led by its Chairman, John Asiedu Nketiah, has inspected ongoing infrastructure works at the Port of Tema to assess their progress and impact on port operations.

The inspection covered recently completed dredging works and the rehabilitation of the port’s breakwaters, projects expected to improve operational efficiency and strengthen the port’s capacity to accommodate larger vessels.

Under the dredging project, selected berths have been deepened from 11 metres to 14 metres, allowing bigger vessels to berth at the port.

The Board received a briefing on the scope and progress of the projects from GPHA’s General Manager of Engineering, Ing. Komla Ofori.

Speaking to the media after the inspection, Mr Asiedu Nketiah expressed satisfaction with the completed dredging works and the progress of the breakwater rehabilitation, particularly the advanced technology being deployed.

He said the breakwater project remained on schedule and was expected to be completed and handed over within a month.

The Director-General of GPHA, Major General Paul Seidu Tanye-Kulono, said he was optimistic that completing the projects would boost the Authority’s operational and commercial prospects by enabling larger vessels to berth safely at the Port of Tema.

The breakwater rehabilitation works are being undertaken by GYTD Group Limited.

  • port
  • breakwater
  • gpha
  • dredging
  • rehabilitation
  • board
  • tema
  • project

Summaries and tags are generated automatically. Stay informed with VidiaNews.

Related news

Chinese naval hospital ship arrives in Tema for a seven-day medical mission
health

Chinese naval hospital ship arrives in Tema for a seven-day medical mission

The Chinese People’s Liberation Army Navy hospital ship, AUSPICIOUS ARK (Hull 868), has arrived at Tema port for a seven-day humanitarian medical mission and friendly visit to Ghana under Mission Harmony 2026. The opening ceremony brought together representatives from the Ghana Armed Forces, the Ministry of Health, the Ghana Health Service, the Ghana Ports and Harbours Authority and other institutions, alongside the visiting Chinese naval delegation.

Read →
Works and Housing Minister gives Ghana Hydrological Authority 3 months to report progress on key challenges
politics

Works and Housing Minister gives Ghana Hydrological Authority 3 months to report progress on key challenges

The Minister for Works, Housing and Water Resources, Ahmed Ibrahim, has directed the Ghana Hydrological Authority (GHA) to submit a comprehensive report on its operational challenges, with progress on key issues expected to be assessed within three months. The Ghana Hydrological Authority provides services including flood forecasting, early warning systems, desilting and coastal protection.

Read →